We are now halfway through the renovation and the main bits are taking shape.
The new metal roof has been installed over the kitchen.
The external wall has been installed on the right of the south side.
A view of the kitchen from the back entrance.
The main console of the kitchen.
The new toilet layout.
The shower room is still very much work in progress.
The installation of traditional wall-paper in the small room is in progress.
The sliding door of the shower room.
Leave a Reply